Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment

Product Details
Customization: Available
After-sales Service: 1 Year
Applicable Material: Tube
Still deciding? Get samples of US$ 19000/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 5 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (24)
  • Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
  • Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
  • Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
  • Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
  • Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
  • Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
Find Similar Products

Basic Info.

Model NO.
JX-HS120B
Drive Mode
Electric
Warranty
1 Year
Speed
85~120 Pieces Per Minute
Tube Diameter(mm)
19~60 mm
Tube Length
45~220 mm
Power
25kw
Weight
4500kg
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
18~23 Minutes
Change Time for The Orifice Pin
20~25 Minutes
Change Time of PE Color
30~35 Minutes
Transport Package
Wood
Specification
3470*2900*2490mm
Trademark
Woolley
Origin
Shanghai
Production Capacity
100set/Year

Packaging & Delivery

Package Size
347.00cm * 290.00cm * 249.00cm
Package Gross Weight
4500.000kg

Product Description

Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder EquipmentMedicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
Extruded Tube Line
(project solution)
line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100)
  line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100)
Laminated Tube Line
 (project solution)
line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100)
  line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50)
Medicine Tube Necking Machine Medicine Tube End Forming for Shoulder Equipment
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.

Q2:Are you manufacturer?
Yes, We are the manufacturer.

Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc


Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.

Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.

Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier