• Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
  • Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
  • Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
  • Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
  • Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
  • Paint Tube Machine Production Line Paint Tube Manufacturing Equipment

Paint Tube Machine Production Line Paint Tube Manufacturing Equipment

After-sales Service: 1 Year
Warranty: 1 Year
Usage: Packaging of Goods
Samples:
US$ 1/Set 1 Set(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Paint Tube Machine Production Line Paint Tube Manufacturing Equipment pictures & photos
Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
US $9,000-10,000 / Set
Min. Order: 1 Set
Manufacturer/Factory & Trading Company
Gold Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Shanghai, China
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 5 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (24)

Basic Info.

Packaging Material
Plastic
Packaging
Tube
Driven Type
Electric
Type
Packaging Production Line
Function
Storage and Packaging
Application
Dairy Products, Cleaning, Detergent, Cosmetics, Skin Care Products, Oil
Soft and Hardness
Soft
Circulation Function
Outer Packing
Frequency of Use
One Packaging
Use
Toothpaste,Cosmetic,Ect
Trademark
Woolley
Origin
China
Production Capacity
100set/Year

Packaging & Delivery

Package Size
1.00cm * 1.00cm * 1.00cm
Package Gross Weight
1.000kg

Product Description

Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
Paint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing Equipment
Paint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing EquipmentPaint Tube Machine Production Line Paint Tube Manufacturing Equipment
Extruded Tube Line
(project solution)
line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100)
  line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100)
Laminated Tube Line
 (project solution)
line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100)
  line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50)
Paint Tube Machine Production Line Paint Tube Manufacturing Equipment
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.

Q2:Are you manufacturer?
Yes, We are the manufacturer.

Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc


Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.

Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.

Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now